Project Quick Facts

90,000 HOMES POWERED
110 MEGAWATTS
(MW)

110 MEGAWATTS (MW)

The Aurora Solar Energy Project located in Port Augusta is a 110 megawatt solar thermal power station using SolarReserve’s proprietary molten salt technology

0 FOSSIL FUEL
popup-image-zero-emissions.jpg

0 EMISSIONS

SolarReserve’s unique solar + storage technology does not require any natural gas backup

495 GIGAWATT-HOURS
POWER PER YEAR
popup-image-storage.jpg

495 GIGAWATT-HOURS POWER PER YEAR

Storage allows the facility to produce more than twice as much net annual output (gigawatt hours) than an equivalent sized photovoltaic (PV) solar project

880 MEGAWATT-HOURS
ENERGY STORAGE

880 MEGAWATT-HOURS ENERGY STORAGE

SolarReserve’s patented solar thermal energy storage technology enables reliable, on-demand, energy production – even after dark

8 HRS FULL LOAD
STORAGE

8 HRS FULL LOAD STORAGE

Storage will enable the plant to operate just like a conventional coal or gas power station, reliably generating electricity day and night – except without any emissions

40 YRS STORAGE WITH
NO DEGRADATION
popup-image-7million-mw.jpg

40+ YEARS STORAGE WITH NO DEGRADATION

Unlike batteries, molten salt lasts for 40 years or more, without any degradation or need for replacement; it also costs less than batteries

4,000 DIRECT, INDIRECT
AND INDUCED JOBS

4,000 DIRECT, INDIRECT AND INDUCED JOBS

The project will create approximately 4,000 direct, indirect, and induced jobs, the majority of which will be in Australia

1,000 CONSTRUCTION
JOBS
popup-image-workers2.jpg

1,000 CONSTRUCTION JOBS

The Aurora project is an example of how sustainable solutions, for energy now and in generations to come, foster new industries and create jobs by the thousands